MBBR, SBR, and MBR sewage treatment plants designed for Kolkata apartments. Low noise, compact footprint, treated water reuse. WBPCB compliant with AMC support.
Get a Free STP Quote WhatsApp UsWBPCB mandates sewage treatment for apartment complexes above 20,000 sq ft built-up area. The Kolkata Municipal Corporation (KMC) building sanction process requires STP provision for multi-storey residential buildings. Without a functioning STP, your society risks WBPCB notices, penalties, and denial of occupancy certificate or renewal.
Beyond compliance, a well-designed STP saves money. Treated water can be reused for gardening, car washing, toilet flushing, and cooling — reducing your fresh water consumption by 30-50% and cutting water bills significantly.
| Technology | Best For | Footprint | Noise Level | Cost Range |
|---|---|---|---|---|
| MBBR | 50-200 flats | Compact | Low | ₹8-30 Lakhs |
| SBR | 200+ flats | Moderate | Low | ₹25-80 Lakhs |
| MBR | Premium reuse | Very compact | Low | ₹20-60 Lakhs |
| Packaged STP | Up to 50 flats | Minimal | Very low | ₹4-12 Lakhs |
| Apartment Size | Typical Capacity | CAPEX Range | Monthly OPEX |
|---|---|---|---|
| 30-50 flats | 10-15 KLD | ₹4-10 Lakhs | ₹8,000-15,000 |
| 50-100 flats | 15-30 KLD | ₹8-20 Lakhs | ₹15,000-25,000 |
| 100-200 flats | 30-60 KLD | ₹15-40 Lakhs | ₹25,000-45,000 |
| 200-500 flats | 60-150 KLD | ₹40-80 Lakhs | ₹40,000-80,000 |
| 500+ flats (township) | 150-500 KLD | ₹80 Lakhs-2 Crore | ₹70,000-1.5 Lakhs |
Population-based design, flow calculation, technology selection, space planning, and WBPCB consent documentation — all before construction begins.
Civil work, equipment installation, piping, electrical, commissioning with performance guarantee. Coordinated with builder/RWA schedule.
Tertiary treatment (filtration + UV/chlorination) for gardening, flushing, and car washing. Dual plumbing advisory included.
Monthly maintenance, chemical supply, operator supervision/training, WBPCB reporting, water quality testing, and 24/7 breakdown response.
Fix non-working STPs. Audit, diagnosis, repair, and upgradation to meet current WBPCB norms. Emergency response within 24 hours.
CTE/CTO application, Silpasathi filing, environmental assessment, consent renewal — integrated with plant design.
Tell us your number of flats, available space, and location. We'll provide a preliminary design and budget estimate within 48 hours.
Request a Proposal WhatsApp Now